Home › Flooring › Solid Hardwood
FloorIQ · Metro Atlanta, GA

Solid Hardwood Floor Installation in Metro Atlanta

Solid hardwood for main and upper floors across greater Metro Atlanta: the long-lived floor you can sand and refinish for decades. Here is how to choose the species and finish, how we install it, and how to care for it.

Licensed & insured · 3-year workmanship guarantee · Serving greater Metro Atlanta & North Georgia

Explore flooring

All flooring →

Our solid hardwood work

BeforeWorn beige carpet on a staircase and upstairs landing before IQ Installs replaced it with hardwood
AfterThe same staircase and landing in stained solid oak hardwood installed by IQ Installs

Before: carpeted stairs and landing. After: the same stairs and landing in stained solid oak, installed and finished by IQ Installs.

Why homeowners choose IQ Installs

Itemized price at the visit

Our estimating software produces a fully itemized price during the in-home consultation, so you see every line before you decide.

Subfloor checked first

We check the subfloor before we quote and level only the areas that need it, instead of charging for the whole floor.

Vetted, trained crews

Installed by IQ vetted and trained crews, with job-site clean-up, debris haul-away and a final walkthrough with you.

3-year workmanship guarantee

Every installation is backed by our 3-year workmanship guarantee. IQ Installs is licensed and insured.

In short

IQ Installs installs solid hardwood across north Metro Atlanta. Solid hardwood is nailed down over a wood subfloor, so it suits main and upper floors, and it can usually be sanded and refinished 3 to 5 times over its life. The wood acclimates in your home for a few days first, then a 1,000 to 1,500 square foot install takes about 3 to 5 days.

Where solid hardwood works best

Solid hardwood is an excellent, long-lasting choice for main and upper floors over a wood subfloor. It is nailed down, so it cannot go directly over a concrete slab: on a slab you either build up a plywood subfloor first or choose engineered hardwood, which is made to go over concrete. For basements, engineered hardwood or LVP handles Georgia's humidity better.

Red oak or white oak

Red oak

A warm, slightly pink tone with a bold, wavy grain that hides everyday wear well. It costs a little less. The classic, traditional look.

White oak

Harder and a touch more water-resistant, with a cooler, neutral tone and a tighter, straighter grain. The go-to for modern light, natural and gray finishes, because it takes those stains without red oak's pink cast.

Prefinished or site-finished

Prefinished hardwood arrives sanded, stained and sealed from the factory, so it installs faster and you can walk on it the same day. Site-finished wood is installed raw, then sanded, stained and coated in your home. It gives a seamless, custom look but adds time and cost, and the finish needs to cure before furniture goes back.

Unfinished solid oak boards newly installed in a living room, before sanding and stain
Site-finished hardwood on the same job: the oak goes down raw, then it is sanded, stained and coated in place.

For site-finished floors you also choose the finish. Oil-based adds a warm amber tone that deepens with age, needs fewer coats and costs a little less, but it has stronger fumes and takes longer to cure. Water-based dries clear, keeps light, natural and gray tones true, has low odor and cures much faster. We usually recommend water-based for light or white-oak looks and oil-based for a classic warm look.

How a job runs

  1. Check the subfloorAt the consultation we confirm a wood subfloor, or plan a plywood build-up over a slab.
  2. Acclimate the woodThe wood needs a few days in your home to acclimate before it is installed.
  3. Remove the old floor and prepWe pull up and haul away the existing flooring and prep the subfloor.
  4. InstallWe nail the boards down, then sand, stain and finish on site if you chose site-finished wood.
  5. Clean up and walk throughWe clean up, haul away job debris, and walk the finished floor with you.

Timeline and walk-on time

After a few days of acclimation, a typical 1,000 to 1,500 square foot solid hardwood install takes about 3 to 5 days. Site-finishing adds time for sanding, staining and cure. You can walk on prefinished hardwood the same day. On site-finished hardwood, wait about 24 hours before light foot traffic in socks, and about 2 to 4 weeks before laying rugs while the finish fully cures.

Finished stained solid oak hardwood in an upstairs hallway installed by IQ Installs
The finished floor in the upstairs hall.

Repairs to older hardwood

Many older Atlanta homes have narrow-strip hardwood, like 1.25-inch boards, that is not a standard modern width. We can special-order matching material to repair or lace in damaged areas so it blends with your existing floor. Because it is a special order, there is a flat additional charge for that material. If the existing floor is sound, a sand and refinish may be all it needs.

Caring for solid hardwood

Dust-mop regularly and clean with a wood-floor cleaner, never water, vinegar or a steam mop. Use felt pads under furniture, add rugs in high-traffic areas, wipe spills promptly, and keep indoor humidity steady to limit seasonal movement.

Choosing your product

You choose your material and style at the in-home consultation, and our estimating software produces a fully itemized price during the visit. Not sure where to start? The Genius Advisor flooring match tool recommends a starting product in a few questions.

Frequently asked questions

Can solid hardwood be installed over a concrete slab?

Not directly. Solid hardwood is nailed down and needs a wood subfloor, so on a concrete slab you either build up a plywood subfloor first or choose engineered hardwood, which is made to go over concrete.

Should I choose red oak or white oak?

Choose white oak for a current light, natural or gray look, since it takes those stains without the pink cast red oak can show. Choose red oak for a traditional warm look on a tighter budget; its bold grain hides everyday wear well.

What is the difference between prefinished and site-finished hardwood?

Prefinished hardwood arrives sanded, stained and sealed from the factory, so it installs faster and you can walk on it right away. Site-finished wood is installed raw and then sanded, stained and coated in your home, which gives a seamless, custom look but adds time and cost.

How long does solid hardwood installation take?

Wood usually needs a few days to acclimate to your home first. A typical 1,000 to 1,500 square foot install then takes about 3 to 5 days, plus time for sanding, staining and finish cure if the floor is site-finished.

How many times can solid hardwood be refinished?

Solid hardwood can usually be sanded and refinished several times over its life, commonly 3 to 5 times, depending on board thickness and past sandings.

Can you match old narrow-strip hardwood?

Yes. Many older Atlanta homes have narrow-strip hardwood, like 1.25-inch boards. We can special-order matching material to repair or lace in damaged areas, with a flat additional charge for the special-order material.

More answers on scheduling, prep and payment are in the flooring and gutter FAQ.

Pricing

About $8–$15 per sq ft installed

2026 Metro Atlanta range for the floor installed. Your exact number depends on the product you choose, what has to come out, and the condition of the subfloor. Old-floor removal, subfloor leveling, furniture moving, stairs and new trim are separate lines on your estimate, only if your home needs them.

For line-by-line pricing, removal costs and sample project totals, see our solid hardwood cost guide.

Get your exact solid hardwood price

We measure, check the subfloor, and hand you an itemized price during the visit.

Book an In-Home Consultation Call (470) 223-2206